MİMAR SİNAN ÖĞRENCİ YURDU
Name Of Project: İSTANBUL MALTEPE REGION 4100 BED CAPACITY STUDENT HOTEL AND INFRASTRUCTURE WORKS PROJECT
LOCATION OF THE PROJECT: İSTANBUL Maltepe
START DATE: January 2016
COMPLETION DATE: September 2016
CONSTRUCTION AREA: 135.060,23 m2
REGİON URBAN RENEWAL PROJECT
Name Of Project: ESENLER HAVAALANI REGION URBAN RENEWAL PROJECT- 2nd STAGE HOUSING AND INFRASTRUCTURE WORKS
LOCATION OF THE PROJECT: Esenler Havaalanı Region
START DATE: June 2014
COMPLETION DATE: December 2016
CONSTRUCTION AREA: 202.000 m2
Flat Type: 1 1, 2 1, 3 1
YALI ATAKÖY
Name Of Project: YALI ATAKÖY (İSTANBUL PROVİNCE, BAKIRKÖY DİSTRİCT, ZEYTİNLİK NEİGHBORHOOD, ISLE 564, PARCEL 186 PROPERTY SALES REVENUE SHARE BASED WORK )
LOCATION OF THE PROJECT: ATAKÖY - İSTANBUL
START DATE: 2013
COMPLETION DATE: 2015 (Planned)
CONSTRUCTION AREA: 212.000 m²
NUMBER OF COMMERCIAL BL: 71
Flat Type: 1 1, 2 1, 3 1, 5 1
KİLİS ELBEYLİ BÖLGESİ KONTEYNER KENTPROJESİ
Name Of Project: KİLİS ELBEYLİ REGION CONTAINER CITY (KİLİS PROVİNCE, ELBEYLİ DİSTRİCT, BEŞİRİYE VİLLAGE 3232 CONTAİNER SUBSTRUCTURE AND SOCİAL SUPPORT CONSTRUCTİON WORK)
CONSTRUCTION AREA: 500.000 m²
HADIMKÖY 2400 MT ROAD – INFRASTRUCTURE – LIGHTING WORK
Name Of Project: HADIMKÖY 2400 mt ROAD – INFRASTRUCTURE – LIGHTING WORK
LOCATION OF THE PROJECT: HADIMKÖY – İSTANBUL
START DATE: 15.11.2006
COMPLETION DATE: 13.12.2006
NİSH ADALAR
Name Of Project: NISH ISLANDS (THE MALTEPE BAŞIBÜYÜK HİLAL COLLECTİVE HOUSİNG HOMES THE 4TH STAGE COLLECTİVE HOUSİNG CONSTRUCTİON WORK BASED ON A REVENUE SHARİNG OF PROPERTY SALES PROCESS )
LOCATION OF THE PROJECT: MALTEPE – İSTANBUL
START DATE: 17.01.2010
COMPLETION DATE: 13.03.2013
CONSTRUCTION AREA: 479.256 m²
NUMBER OF HOMES: 2322
NUMBER OF COMMERCIAL BL: 30
Flat Type: 1 1, 2 1, 3 1 AND 4 1
Flat Area: 1 1 - 83 m²- 99m², 2 1 - 110 m² - 123 m² - 146 m² - 154 m², 3 1 - 141 m² – 198 m², 4 1 208 m²
NİSH İSTANBUL (ÇOBANÇEŞME, 2007-2009)
Name Of Project: NISH ISTANBUL
LOCATION OF THE PROJECT: ÇOBANÇEŞME - YENİBOSNA – İSTANBUL
START DATE: 01.05.2008
COMPLETION DATE: 31.03.2010
CONSTRUCTION AREA: 135.000 m²
NUMBER OF HOMES: 585
NUMBER OF COMMERCIAL BL: 51
Flat Type: 1 1 (374 flats), 2 1 (196 flats) and 3 1 (15 flats)
Flat Area: 2 SPACES PER FLAT İN THE CLOSED CAR PARK (30,M²)
NUMBER OF OFFICES: 64
IHLAMUR HOUSES (HALKALI, 2005-2007)
Name Of Project: IHLAMUR HOMES (PROPERTY SALE REVENUE SHARİNG WORK OF THE ISTANBUL – HALKALI COLLECTİVE HOMES AREA PARCEL NO.451/10)
LOCATION OF THE PROJECT: HALKALI – İSTANBUL
START DATE: 24.08.2004
COMPLETION DATE: 09.05.2007
CONSTRUCTION AREA: 100.170 m²
NUMBER OF HOMES: 360
Flat Type: 3 1 (192 HOMES) – 4 1 (168 HOMES)
Flat Area: 163 m² (3 1) - 187 m² (4 1) 2 FLOOR COVERED CAR PARK – 2 PARKİNG SPACES PER FLAT
MALTEPE KİPTAŞ 1ST STAGE (MALTEPE, 2007-2009)
Name Of Project: ADATEPE COMPLEX (THE MALTEPE BAŞIBÜYÜK HİLAL COLLECTİVE HOUSİNG HOMES AND SOCİAL FACİLİTY) (CLUB BUİLDİNG, BUFFET BAR AND MULTİSTORY CAR PARK) CONSTRUCTİON DONE BY REVENUE SHARİNG İN EXCHANGE FOR FLATS PROCEDURE)
LOCATION OF THE PROJECT: MALTEPE – İSTANBUL
START DATE: 17.09.2007
COMPLETION DATE: 23.11.2009
CONSTRUCTION AREA: 182.859 m²
NUMBER OF HOMES: 878
Flat Type: 2 1 (428 HOMES) AND 3 1 (450 HOMES)
Flat Area: 105 m² (2 1), AND 135 m² (3 1)
SİLİVRİ KİPTAŞ HOUSES (SİLİVRİ, 2006-2008)
Name Of Project: SİLİVRİ BAŞAK HOMES (3RD REGİON HOME CONSTRUCTİON DONE BY REVENUE SHARİNG İN EXCHANGE FOR FLATS PROCEDURE)
LOCATION OF THE PROJECT: İKİTELLİ – İSTANBUL
START DATE: 04.12.2006
COMPLETION DATE: 24.07.2008
CONSTRUCTION AREA: 65.610 m²
NUMBER OF HOMES: 748
Flat Type: 2 1
Flat Area: 75 m²
IHLAMUR SHOPPİNG MALL (HALKALI, 2005-2007)
Name Of Project: IHLAMUR SHOPPING CENTER (PROPERTY SALE REVENUE SHARİNG WORK OF THE ISTANBUL – HALKALI COLLECTİVE HOMES AREA PARCEL NO.451/10)
LOCATION OF THE PROJECT: HALKALI – İSTANBUL
START DATE: 24.08.2004
COMPLETION DATE: 09.05.2007
CONSTRUCTION AREA: 13.000 m²
Flat Type: 3 FLOOR SHOPPİNG CENTER – 2 FLOOR CAR PARK
KİPTAŞ 5TH STAGE 2ND SECTİON
Name Of Project: İKİTELLİ BAŞAK COLLECTIVE HOUSING (THE CONSTRUCTİON AND İNFRASTRUCTURE OF 216 HOMES İN THE 5TH STAGE 1ST SECTİON – 2ND REGİON, LANDSCAPİNG AND OG/AG ELECTRİCAL İNFRASTRUCTURE WORK BASED ON A REVENUE SHARİNG PROCESS)
LOCATION OF THE PROJECT: İKİTELLİ – İSTANBUL
START DATE: 22.11.2004
COMPLETION DATE: 04.04.2006
CONSTRUCTION AREA: 36.224 m²
NUMBER OF HOMES: 216
Flat Type: 3 1
Flat Area: 150 m²
BAŞAKŞEHİR STATE HOSPİTAL (İKİTELLİ, 1998-1999)
Name Of Project: KİPTAŞ GENERAL DIRECTORATE BUILDING (CONTINUES TO PROVIDE SERVICES AS A STATE HOSPITAL SINCE 2008)
LOCATION OF THE PROJECT: İKİTELLİ – İSTANBUL
START DATE: 22.02.1999
COMPLETION DATE: 29.08.2000
CONSTRUCTION AREA: 13.000 m²
KİPTAŞ 4TH STAGE 2ND SECTİON
Name Of Project: İKİTELLİ BAŞAK COLLECTIVE HOUSING (THE CONSTRUCTİON AND İNFRASTRUCTURE OF 96 HOMES İN THE 4TH STAGE 2ND SECTİON – 40TH REGİON)
LOCATION OF THE PROJECT: İKİTELLİ – İSTANBUL
START DATE: 06.03.2002
COMPLETION DATE: 03.02.2003
CONSTRUCTION AREA: 14.304 m²
NUMBER OF HOMES: 96
Flat Type: 3 1
Flat Area: 149 m²
ÜNALAN HOUSES (ÜNALAN, 1996-1997)
Name Of Project: ÜNALAN COLLECTIVE HOUSING AND LANDSCAPING CONSTRUCTION
LOCATION OF THE PROJECT: ÜNALAN - ÜSKÜDAR - İSTANBUL
START DATE: 14.01.1998
COMPLETION DATE: 28.12.1998
CONSTRUCTION AREA: 17.260 m²
NUMBER OF HOMES: 128
Flat Type: 3 1
Flat Area: 135 m²
MERCEDES BENZ TÜRK A.Ş. HOŞDERE FACİLİTİES
Name Of Project: MERCEDES BENZ TÜRK A.Ş. HOŞDERE FACILITIES (A 12 CELLED, DOUBLE BUS BARRED DİSTRİBUTİON CENTER AND DİSTRİBUTİON CENTER AUTOMATİC TRANSFER SYSTEM)
LOCATION OF THE PROJECT: HOŞDERE – HADIMKÖY- İSTANBUL
START DATE: 01.08.1993
COMPLETION DATE: 01.12.1995
İKİTELLİ BAŞAK HOMES
Name Of Project: İKİTELLİ BAŞAK HOMES (1. STAGE MEDIUM VOLTAGE – LOW VOLTAGE TRANSFORMER AND DISTRIBUTION NETWORK AND STREET LIGHTING WORK)
LOCATION OF THE PROJECT: İKİTELLİ- İSTANBUL
START DATE: 06.06.1996
COMPLETION DATE: 24.09.1996
KAĞITHANE BAŞAK COLLECTİVE HOUSİNG
Name Of Project: KAĞITHANE BAŞAK COLLECTIVE HOUSING (1. STAGE MEDİUM VOLTAGE – LOW VOLTAGE TRANSFORMER AND DİSTRİBUTİON NETWORK AND STREET LİGHTİNG WORK)
LOCATION OF THE PROJECT: KAĞITHANE- İSTANBUL
START DATE: 15.10.1996
COMPLETION DATE: 25.12.1996
PENDİK HİLAL COLLECTİVE HOMES
Name Of Project: PENDİK HİLAL COLLECTIVE HOMES (1. STAGE MEDİUM VOLTAGE – LOW VOLTAGE TRANSFORMER AND DİSTRİBUTİON NETWORK AND STREET LİGHTİNG WORK)
LOCATION OF THE PROJECT: PENDİK- İSTANBUL
START DATE: 18.03.1997
COMPLETION DATE: 14.08.1997
Fair And Exhibition Center
Name Of Project: FAIR AND EXHIBITION CENTER(16 Celled 34.5 Kw distribution center)
LOCATION OF THE PROJECT: YEŞİLKÖY- İSTANBUL
START DATE: 21.11.1997
COMPLETION DATE: 24.02.1998
İKİTELLİ BAŞAK HOMES POWER TRANSPORT LİNE WORK
Name Of Project: İKİTELLİ BAŞAK HOMES (4TH STAGE MEDİUM VOLTAGE – LOW VOLTAGE TRANSFORMER AND DİSTRİBUTİON NETWORK AND STREET LİGHTİNG WORK – POWER TRANSPORT LİNE DİSPLACEMENT WORK)
LOCATION OF THE PROJECT: İKİTELLİ- İSTANBUL
START DATE: 26.01.1999
COMPLETION DATE: 02.01.2001
İKİTELLİ BAŞAK HOMES 4TH STAGE – 2ND SECTİON
Name Of Project: İKİTELLİ BAŞAK HOMES (4TH STAGE – 2ND SECTİON MEDİUM VOLTAGE – LOW VOLTAGE TRANSFORMER CENTERS AND DİSTRİBUTİON NETWORK AND TÜRK TELEKOM TRANSFORMER CENTER CONSTRUCTİON WORK)
LOCATION OF THE PROJECT: İKİTELLİ- İSTANBUL
START DATE: 21.05.2001
COMPLETION DATE: 30.06.2002
PENDİK AYDOS HİLAL COLLECTİVE HOMES
Name Of Project: PENDİK AYDOS HİLAL COLLECTIVE HOMES (MEDİUM VOLTAGE – LOW VOLTAGE TRANSFORMER CENTER AND DİSTRİBUTİON NETWORK CONSTRUCTİON WORK)
LOCATION OF THE PROJECT: AYDOS - PENDİK- İSTANBUL
START DATE: 26.06.2002
COMPLETION DATE: 03.12.2003
İKİTELLİ BAŞAK HOMES 5TH STAGE – 1ST SECTİON
Name Of Project: İKİTELLİ BAŞAK HOMES (THE CONSTRUCTİON AND İNFRASTRUCTURE OF 216 HOMES İN THE 5TH STAGE – 1ST SECTİON – 2ND REGİON, LANDSCAPİNG AND OG/AG ELECTRİCAL İNFRASTRUCTURE WORK BASED ON REVENUE SHARİNG PROCESS)
LOCATION OF THE PROJECT: İKİTELLİ- İSTANBUL
START DATE: 22.11.2004
COMPLETION DATE: 04.04.2006
AKPINAR INDUSTRIAL COMPLEX
Name Of Project: AKPINAR INDUSTRIAL COMPLEX (O.G. CABLE NETWORK DISTRIBUTION AND TRANSFORMER CENTER AND LIGHTING WORK)
LOCATION OF THE PROJECT: AKPINAR – HADIMKÖY - ISTANBUL
START DATE: 01.06.2006
COMPLETION DATE: 31.12.2007
PUTTİNG LİGHTİNG ON VALUABLE HİSTORİCAL
Name Of Project: PUTTING LIGHTING ON VALUABLE HISTORICAL ASSETS THROUGHOUT THE CITY OF ISTANBUL
LOCATION OF THE PROJECT: ISTANBUL
START DATE: 17.03.1998
COMPLETION DATE: 28.08.1998
YEDİKULE WALLS – ORTAKÖY MOSQUE -BEYAZIT MOSQUE – BEYLERBEYİ MOSQUE -PİYALEPAŞA MOSQUE – DOLMABAHÇE MOSQUE KILIÇ ALİ PAŞA MOSQUE – VALİDE SULTAN MOSQUE -AYAZMA MOSQUE – YAHYA EFENDİ MOSQUE -EMİRGAN MOSQUE – ŞEHZADE BAŞI MOSQUE -CİHANGİR MOSQUE – SOKULLU MEHMET PAŞA MOSQUE -MURAT PAŞA MOSQUE – NUSRETİYE MOSQUE MİHRİMAH SULTAN MOSQUE – MOLLA FENARİ İSA MOSQUE -MOLLA ZEYREK MOSQUE